Control of Materials and Costs for Ready-Mix Concrete Using the Material Requirements Planning Method
DOI:
https://doi.org/10.55927/mudima.v6i6.67Keywords:
Material Requirements Planning (MRP) Method, Operational CostsAbstract
One of the stages that must be completed before implementing a construction project is the planning stage. Planning for construction project material requirements is a critical component, as material resources constitute one of the largest components of total project costs, alongside equipment, labor, and work methods. This study aims to optimize the control of materials and ready-mix concrete costs in the Solo Raya Tourism Polytechnic construction project using the Material Requirements Planning (MRP) method. This method assists in efficient material requirements planning, minimizes waste, and improves overall project performance. Based on the results of material requirement calculations conducted for the Solo Raya Tourism Polytechnic construction project, it was found that the most appropriate material ordering method among several Lot Sizing methods is the Lot-for-Lot Method, which yields the lowest operational cost of Rp29,580,000. 00, compared to the Part Period Balancing Method at Rp38,238,205.00 and the Least Unit Cost Method at Rp56,442,800.00
References
Astana Yudha I Nyoman. 2007. Perencanaan Persediaan Bahan Baku Berdasarkan Metode MRP (Material Requirements Planning).
Ariyanto S. Arief , dkk. 2019. Pengaruh keterlambatan Material Terhadap resiko Proyek pembangunan Gedung Parkir, Jurusan Teknik Sipil, Politeknik Negeri Semarang
Handra Tessa dan Shibyl Rangian. 2017, Analisis Perbandingan Total Biaya persediaan Antara Kebijakan perusahaan dengan Metode Economic Order Quantitu (EOQ) Pada PT LCG, Universitas Multimedia Nusantara
Putranto Herry Chandra, 2001. Aplikasi Material Requirement Planning Untuk Mengendalikan Investasi Pengadaan Material Pada PT.JHS Pilling System Universitas Kristen Petra, Surabaya
Setiawan Dedi. 2020. Analisa Persediaan Bahan Material Bangunan dengan menggunakan Metode Economic Order Quantity (EOQ) (Studi Kasus pekerjaan Renovasi Gedung Aula Tahap I Lembaga Pejamin Mutu Pendidikan (LPMP) JL. Cipto Mangunkusumo KM.2 Samarinda Kalimantan Timur
Limbong Inggried. 2013. Manajemen Pengadaan Material Bangunan dengan Menggunakan Metode MRP (Material Requirement Planning) Studi Kasus: Revitalisasi Gedung kantor BPS Provinsi Sulawesi Utara, Fakultas Teknik, Jurusan Teknik Sipil Universitas Sam Ratulangi
Maury, Jonathan dkk. 2018. Perencanaan Biaya Berdasarkan Jumlah dan Waktu Pemesanan Dengan Metode MRP (Material Requirement Planning) Fakultas Teknik, Jurusan Sipil, Unversitas Sam Ratulangi Manado.
Pratiwi Wahyu Titis, dkk. 2014, Analisa Persediaan Material Pada Proyek Pembaungunan Jembatan Sungai Brantas di Ruas Tol Kertosono- mojokerto Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan Institut teknologi Sepuluh Nopember Jl. Arief Rahman Hakim, Surabaya
Wibawanti Y. 2019. Analisa Perencanaan Kebutuhan Material Proyek Dengan Metode Material Requirement Planning, Program Studi Informatika, Universitas Indraprasta PGRI
Tuino, Ismail. 2016. Analisa Kebutuhan Material Pada Proyek Pembangunan Gedung DPRD Provinsi Sulawesi Utara. ,Politeknik Negeri Manado
Dundu, Ariestides, and R. J. M. Mandagi. "Pemilihan Sistem Penyediaan Air Baku Di Pulau Kahakitang Kabupaten Kepulauan Sangihe." J@ ti Undip: Jurnal Teknik Industri 7.2 (2012): 85-94
Mantiri, Nixon, Bonny Sompie, and Debby Wilar. "PEMILIHAN PEMASOK MATERIAL READY MIX PADA PEMBANGUNAN GEDUNG STAR SQUARE DI KOTA MANADO." Sabua: Jurnal Lingkungan Binaan dan Arsitektur 5.3 (2013): 124-133.
Muntasar, Theresia Fitriyani, Ellen J. Kumaat, and Robert JM Mandagi. "Penentuan Skala Prioritas Proyek Pembangunan Jalan Di Kabupaten Banggai Kepulauan Dengan Menggunakan Proyek Hirarki Analitik." Jurnal Ilmiah Media Engineering 1.1 (2011).
Marimin, M. (2004). Teknik dan Aplikasi Pengambilan Keputusan Kriteria Majemuk. PT. Grasindo, Jakarta.
Saaty, T. L. (2021). Pengambilan Keputusan; Bagi Para Pemimpin Proses hirarki analitik untuk pengambilan keputusan dalam situasi yang komplek.
Saaty, T. L., Vargas, L. G., Saaty, T. L., & Vargas, L. G. (2012). The seven pillars of the analytic hierarchy process. Models, methods, concepts & applications of the analytic hierarchy process, 23-40.
Triantaphyllou, E., & Mann, S. H. (1995). Using the analytic hierarchy process for decision making in engineering applications: some challenges. International journal of industrial engineering: applications and practice, 2(1), 35-44
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Trio Pendekar Lonan, Daisy D. G. Pangemanan, Estrellita V. Y. Waney, Nixon Mantiri

This work is licensed under a Creative Commons Attribution 4.0 International License.